With $1.8 million in hand from a private placement,
The work will precede an underground sampling campaign slated for January. Verena also plans to drill the Bonfim and Bonfim North deposits in an atttempt to confirm historical resources. An updated resource estimate is expected to be announced in the second quarter of 2004.
Earlier this year, Roscoe Postle Associates recommended mapping, underground sampling, and sampling of some 56,000 tonnes of material on old leach pads. The firm also suggested 4,500 metres worth of diamond drilling on 25-metre centres at the former mine site. An additional 1,000 metres of drilling in 10 holes was recommended for Bonfim North, 1 km to the north.
Bonfim operated as an underground scheelite mine from 1969 until it closed as a result of depressed prices in 1981.
Be the first to comment on "Verena dusts off Bonfim (January 05, 2004)"