This new drilling is follow-up work to further test an area where Hole No 157 cut 0.19 oz gold across 30 ft and Hole No 160 cut 0.30 oz gold across 8 ft at a depth of 550 ft and another intersection in the same Hole of 0.53 oz gold across 27 ft at a depth of 600 ft.
Drilling in the shaft area using two machines is still in progress.
Ore reserves on the Hislop East property are quoted as 725,560 tons above the 450-ft level grading 0.20 oz gold uncut.
]]>
Be the first to comment on "Goldpost Resources intersects gold"