Imperial feasibility for Mt. Polley due March

Imperial, which holds a 33.64% interest and is operator, has commissioned Wright Engineers to prepare the study for the proposed open pit mining operation. It will cover ore reserves, metallurgy, environmental impact, capital and operating costs, pit design, production scheduling...