Underground drilling in the Howard tunnel in B.C., by Levon Resources has extended the No 2 zone, the company says. Levon drilled six holes above and below a 123-ft section which assayed 0.69 oz gold per ton across an average width of 4.6 ft.
Four of the better holes included 87-3 which cut an 8-ft section grading 2.3 oz and hole 87-4 which intersected 5 ft assaying 0.157 oz. Hole 87-5 intersected 20.2 ft grading 0.289 oz. Another hole, 87-6 cut a 31-ft section grading 0.37 oz. The drill sections are not true widths.
Drifting on the Howard tunnel is half completed with 500 ft remaining, Levon reports.
Be the first to comment on "Zone extended by Levon drilling"