A ramp on the Vedron Ltd. Timmins, Ont., gold property has advanced 450 ft, the company reports. Being driven to the 500-ft level, the ramp will provide access for underground drilling and bulk sampling.
Vedron hopes to prove up reserves of 500,000 tons grading 0.2-0.3 oz gold per ton above the 500-ft level. Access below 500 ft is from the adjoining Buffalo Ankerite mine workings.
Be the first to comment on "Vedron advancing its decline ramp"