President Albert Applegath reports that two drills are currently operating on the project with one machine continuing to drill in-fill holes on the “MP” zone and a second rig testing a number of other anomalies on the property.
Recent drilling on the MP zone intersected a number of narrow high grade gold values with highlights as follows: Hole Width (ft) (oz/t) Grade 24 3.0 0.28
1.6 1.80 22 4.0 1.33
6.7 1.55 13 2.1 0.42 19 4.8 0.34
3.3 0.60
The recent drill program, consisting of some 32 holes to date, has tested the MP zone along a strike length of 2,400 ft and at intervals of 200 ft.
]]>
Be the first to comment on "Tundra Gold options more Quebec claims"