A second drilling program of 23 holes representing 16,850 ft was recently completed by St. Genevieve Resources and Augmitto Explorations on the Parbec property, located about two miles west of Malartic in northwestern Quebec.
In the main shear zone, 18 holes were drilled; five holes were drilled on the northern part of the property. Among the better results: Hole Width Grade
(ft) (oz/t) PAR-8716 16 0.15 PAR-8717 6.5 0.43
5 0.28 PAR-8724 2.5 0.17 PAR-8726 7 0.15
2.5 0.31 PAR-8728 12.5 0.25
5 0.15 PAR-8732 6.5 0.56 PAR-8733 2.5 0.19
Augmitto has committed $500,000 to upgrade a winter road to the property into an all-weather route. Augmitto will also prepare the portal of an incline ramp to take bulk samples and further explore the three mineralized areas outlined from surface drilling along the main shear zone, the companies say.
St. Genevieve has a 70% interest in the property, and Augmitto 30%.
Be the first to comment on "St. Genevieve, Augmitto finish second drilling"