New Gold closes $375-million financing

Vancouver – New Gold (NGD-T, NGD-X) has closed a $375.3 million financing, leaving the company with some $400 million in the bank to fund mine development at its New Afton copper-gold project in south-central B.C.

New Gold issued and sold a total of 55,000 debentures for $55 million, 220,000 units for $220 million, and 10.7 million shares as well as 2 million flow-through shares for a total of $100.3 million.

Flow-through shares were sold at $9.75 apiece and shares at $7.50 each. The debentures have a 7-year term, 5% coupon, and are convertible into common shares at $9.35 per share. The units each consist of an unsecured series D note with a $1000 face value, a 10% coupon, and a 10-year term, as well as 100 common share purchase warrants, each exercisable to acquire one common share for 10 years at $15 per share.

New Gold can now press forward with developing its 100%-owned New Afton project just west of Kamloops. The site is host to a deep, high-grade copper-gold porphyry with probable ore reserve estimate of 44.4 million tonnes grading 0.98% copper, 0.72 gram gold per tonne, and 2.27 grams silver per tonne.

The financing is a major step forward for New Gold, but investors were not overly excited. New Golds share price climbed just a penny, to $6.71, leaving it still in the slump it had fallen into over the past eight months in November the company posted a closing high of $10.

The New Afton project sits on the site of the old open-pit Afton Mine, which produced roughly 500 million lbs. copper, 500,000 oz. gold, and 3 million oz. silver between 1978 and 1987. Through its predecessor company DRC Resources, New Gold staked the mineral rights in 1999, and by 2003 had outlined a large copper-gold orebody. A 2004 scoping study indicated the project had potential as an underground mine, so in 2005 the company completed more than 2 km of tunneling to provide access for infill drilling and geotechnical analysis.

A feasibility study was released in April. It confirmed that the project is economically and technically feasible as an underground block cave mine, accessed via a ramp from surface. Initial construction is expected to take two years, meaning commercial production could be underway by mid-2009. Mine life is currently projected at 12 years.

Upon start-up, the mine is expected to produce 1.6 million tonnes of ore per year for two years. After the ramp-up period, ore production is set to increase to 4 million tonnes annually, making it one of Canadas largest underground metals mines.

New Gold needed to raise funds to finance the US$268 million in capital costs necessary to bring the mine into production, plus the US$137 million required in expansion capital and US$78 million in sustaining costs.

Print

Be the first to comment on "New Gold closes $375-million financing"

Leave a comment

Your email address will not be published.


*


By continuing to browse you agree to our use of cookies. To learn more, click more information

Dear user, please be aware that we use cookies to help users navigate our website content and to help us understand how we can improve the user experience. If you have ideas for how we can improve our services, we’d love to hear from you. Click here to email us. By continuing to browse you agree to our use of cookies. Please see our Privacy & Cookie Usage Policy to learn more.

Close