A second phase of drilling will begin shortly on the Cat Town polymetallic project in Mariposa Cty., Calif.
Partners Atna Resources (VSE) and Laramide Resources (TSE) each hold half of an option to acquire the project.
A first-phase program of seven holes totaling 2,926 ft. was recently completed.
The best result was 10 ft. averaging 7% zinc, 0.2% copper and 0.03 oz. gold per ton.
Be the first to comment on "More drilling for Cat Town in California"