Falco moves closer to Horne 5 development with Glencore agreement in principle

Drillers at Falco Resources’ Horne 5 gold project in Quebec. Credit: Falco Resources.

Falco Resources (TSXV: FPC) and Glencore (LSE: GLEN) have signed an agreement in principle that paves the way for Falco to develop its Horne 5 project in Quebec.

The agreement in principle outlines the terms that will be in a finalized operating licence and agreement (OLIA) expected in the third quarter. These include the establishment of a joint technical and strategic committee to collaborate on development of Horne 5; rights of access, use and transformation rights in favour of Falco; and financial assurances and indemnification to cover risks to Glencore’s Horne smelting operations, located within 1 km of Horne 5. Glencore will also have the right to appoint one representative to Falco’s board.

Located in the Rouyn-Noranda area, Horne 5 lies at a depth of between 600 and 2,300 metres, below the past-producing Horne mine. In order to access the gold-silver-copper-zinc deposit, Falco needs to rehabilitate an existing shaft, owned by Glencore. Glencore owns the mining concession at the property, while Falco holds mineral rights below 200 metres and surface rights around the shaft.

“The agreement with Glencore is a major step for Falco,” said Haywood Securities’ mining analyst Pierre Vaillancourt in a research note. “Assuming the Principal Operating License and Indemnity Agreement are finalized in (the third quarter), and progress is made with permitting and early works, Falco will be in position to start the dewatering process for Horne 5 by the summer of 2022.”

The two companies previously signed a life-of-mine offtake agreement for copper and zinc concentrates last October, and began a $7.5 million work program in November to mitigate potential risks to Glencore’s operations from Horne 5. The program, financed largely through a convertible debenture financing provided by Glencore, includes geotechnical and water management work as well as an investigation of synergies between the project and the Horne Smelter.

In other news, Falco announced on June 30 that it has signed an option agreement with First Quantum Minerals (TSX: FM) to acquire 100% of two sites near Rouyn-Noranda (Norbec and Millenbach), which can be used as Falco’s tailings management facility. The properties are located at a former tailings facility (the old Norbec mine), “which has already been impacted by historical mining activities,” Falco says, and sits about 11 km from Horne 5.

Falco released an updated feasibility study for Horne 5 in April outlining a US$844.2-million, 15-year mine producing 220,300 oz. of gold annually.

The project contains measured and indicated resources totalling 105.6 million tonnes grading 1.44 grams gold per tonne, 14.32 grams silver per tonne, 0.17% copper and 0.79% zinc (2.25 grams gold-equivalent) per tonne, based on a $55 net smelter return cutoff. Inferred resources add 24.3 million tonnes grading 1.35 grams gold per tonne, 21.4 grams silver per tonne, 0.19% copper and 0.67% zinc (2.23 grams gold-equivalent per tonne).

Print

1 Comment on "Falco moves closer to Horne 5 development with Glencore agreement in principle"

  1. Hard to believe there is much margin at 2.25g/t Au for an underground mine.

Leave a comment

Your email address will not be published.


*


By continuing to browse you agree to our use of cookies. To learn more, click more information

Dear user, please be aware that we use cookies to help users navigate our website content and to help us understand how we can improve the user experience. If you have ideas for how we can improve our services, we’d love to hear from you. Click here to email us. By continuing to browse you agree to our use of cookies. Please see our Privacy & Cookie Usage Policy to learn more.

Close