A 6,000-metre drill program by
Major General now holds 136 claims covering 5,440 ha in the Despinassy project area. The land package was assembled to cover a potential 12-km strike length of the Despinassy deformation zone.
The winter program will consist of 4-5 holes. Two will be drilled on newly acquired claims, while two others will be drilled to close gaps in a fence of holes at the eastern end of the main Despinassy property.
The program will test the area where hole 17 cut a 21.3-metre-wide zone grading 6.42 grams gold per tonne, within a wider, low-grade zone that assayed 2.37 grams gold over 61.4 metres.
Be the first to comment on "EXPLORATION ’99 – Cameco drilling Despinassy"