Partners Winspear Resources (WSP-V) and Aber Resources (ABZ-T) have resumed drilling in the Snap Lake area of the Camsell Lake project in the Northwest Territories.
A program of up to 2,200 metres is targeting the area of anomaly CL 186, where two previous holes intersected a complex kimberlite breccia.
Selective sampling of the first of two holes returned 2 macrodiamonds and 9 microdiamonds from a 39-kg sample taken between the downhole intervals of 106 to 120.4 metres and 141 to 159 metres. A second, 43-kg sample, recovered from a further depth of 187.5 to 211 metres, yielded 20 macros and 36 micros.
Results from the second hole, 55 metres west of the discovery hole, remain pending.
The Camsell Lake joint venture is split between Winspear and Aber on a 57.3%-42.7% basis, respectively.
Be the first to comment on "DIAMOND PAGE — Drilling resumes at Camsell Lake"