Drill hole NR-29 at the Rainy River property of Nuinsco Resources (TSE) was drilled at an angle of 65 and the mineralized intersection of 7.7 metres is believed to have intersected the mineralized body across its true thickness.
Our issue of May 6 contained incorrect information about the drill hole angle and the true width of the mineralized zone.
Be the first to comment on "Correction (May 13, 1996)"