Drilling on the Casino copper-gold project in southern Yukon returned a number of wide intersections for owners Casino Silver Mines (VSE) and Big Creek Resources (VSE).
Big Creek is earning a 50% working interest in the property by spending $2 million by year-end, a further $1.5 million by the end of 1993 and an additional $4 million to May 1, 1998.
The company can also reduce Casino’s participation to a 10% net profits interest by paying it a total of $15 million.
Big Creek also has the right to sell the property for a minimum of $15 million with the proceeds split between the two companies based on a scaled formula.
The recent drilling marks the completion of an initial 8-hole program designed to upgrade results from drilling in the late 1960s and early 1970s which outlined a preliminary open pit reserve of about 170 million tons grading 0.37% copper and 0.039% molybdenum, with a strip ratio of about 1.7-to-1.
Consultanting firm Archer Cathro & Associates is directing the exploration program and president Alan Archer said drilling is continuing on the property with one rig.
Archer said the drilling is being conducted on a 400-ft. grid primarily centred between the old holes on the property, although some of the drilling will twin old holes for comparison purposes.
The company believes the previous drilling understated copper grades while generally ignoring gold values. Archer said there is a good chance the company can outline a higher-grade starter pit of about 70 million tons to improve the payback on the project.
Big Creek estimates that copper and gold values could increase by 30% based on results from the recent drilling.
Archer said Big Creek does not have any major funding plans for the near term, and he noted that funds for continuing work on the property are being raised through small private placements as required.
Assay results from the first eight holes follow:
Hole Zone Interval Width Au Cu Mo
(ft.) (ft.) (oz./ton) (%) (%)
123 Leached cap 27-77 50 0.017 0.13 0.041
Supergene 77-342 265 0.026 0.77 0.047
Hypogene 342-600 258 0.015 0.41 0.032
124 Leached cap 8-37 29 0.011 0.04 0.012
Supergene 37-222 185 0.039 1.55 0.026
Hypogene 222-600 378 0.019 0.58 0.047
125 Leached cap 10-142 132 0.008 0.11 0.025
Supergene 142-364 222 0.010 0.55 0.028
Hypogene 364-700 336 0.008 0.23 0.024
126 Leached cap 10-385 375 0.013 0.16 0.059
Supergene 385-602 217 0.013 0.52 0.053
Hypogene 602-800 199 0.009 0.29 0.066
127 Leached cap 11-362 351 0.015 0.13 0.043
Supergene 362-582 220 0.021 0.76 0.042
Hypogene 582-800 218 0.018 0.36 0.078
128 Leached cap 12-272 260 0.023 0.14 0.064
Supergene 272-657 385 0.011 0.40 0.031
Hypogene 657-900 243 0.012 0.35 0.035
129 Leached cap 10-167 157 0.005 0.22 0.032
Supergene 167-302 135 0.007 0.46 0.051
Hypogene 302-600 298 0.008 0.24 0.051
130* Hypogene 60-147 87 0.004 0.15 0.085
147-461 314 0.012 0.33 0.051
* hole lost in broken ground