QMX drills Bonnefond gold project in Quebec

Infill drilling at QMX Gold’s (TSXV: QMX) Bonnefond deposit, near Val d’Or, Que., continues to hit strong intercepts as the company prepares a resource update to be released this summer.

The junior released assays from nine holes drilled in the eastern part of the deposit meant to test the extension of mineralized shears east of the Bonnefond intrusive, along 200 metres of strike.

Hole 105A targeted a deep mineralized shear zone discovered by past operator Aur Resources in 1997. The historic hole cut 12 metres of 12.2 grams gold per tonne starting at 850 metres depth, while hole 105A hit the same shear zone 40 metres south and returned 15 metres of 4.98 gold from 775 metres depth. That interval included a shorter 1-metre section grading 32.78 grams gold.

Other highlights include 5 metres of 4.8 grams gold (including 1 metre of 10.92 grams gold) from 77 metres depth in hole 102; and 3 metres of 3.39 grams gold starting at 571 metres in hole 106.

The three highlight holes were drilled closest to the Bonneford intrusive. While the six other holes intercepted the shear system, alteration and mineralization were not as developed.

“We continue to intersect excellent high-grade gold values at Bonnefond,” said Andreas Rompel, QMX’s vice-president exploration, in a press release. “This time we aimed at the individual shears and proved their prospectivity.

“This does not come as a surprise as shears are the conduit for gold-bearing fluids; however, the knowledge of the orientation of the shears and their conjugate fault sets is of the utmost importance to intersect them with diamond drill holes on a consistent basis.”

Other highlights from Bonnefond include 101 metres of 2.31 grams gold, drilled last month in the central part of the deposit.

After closing its exploration office in Val d’Or in March as a result of the coronavirus pandemic, QMX resumed drilling with two drill rigs on May 12 on the western part of the Bonnefond deposit. The drilling, which consists of a planned 3,800 metres, will be incorporated into a resource update this summer. The company completed about 14,400 metres of drilling earlier this year before provincial restrictions forced it to suspend exploration.

Once the resource update is complete, QMX will follow up with drilling on other targets at its extensive, 200-sq.-km Val d’Or land package this summer.

Last year, the company released a maiden resource estimate for Bonnefond, with indicated resources of 4.8 million tonnes at 1.69 grams gold for 258,700 oz. and additional inferred resources of 2.4 million tonnes at 1.87 grams for 145,100 ounces.

— This article first appeared in the Canadian Mining Journal.

Print

Be the first to comment on "QMX drills Bonnefond gold project in Quebec"

Leave a comment

Your email address will not be published.


*


By continuing to browse you agree to our use of cookies. To learn more, click more information

Dear user, please be aware that we use cookies to help users navigate our website content and to help us understand how we can improve the user experience. If you have ideas for how we can improve our services, we’d love to hear from you. Click here to email us. By continuing to browse you agree to our use of cookies. Please see our Privacy & Cookie Usage Policy to learn more.

Close