Premier updates PEA for ‘cornerstone asset’ McCoy-Cove

The McCoy-Cove project. Credit: Premier Gold Mines.

Following the announcement last month of the sale of Premier Gold Mines (TSX: PG) to Equinox Gold (TSX: EQX; NYSE-AM: EQX), Premier has released an updated preliminary economic assessment for its McCoy-Cove property in Nevada. The past-producing asset will be part of i-80 Gold, a U.S.-focused spin-out with shares of this new company distributed to Premier’s existing shareholders.

The latest PEA suggests an eight-year, 1,070 tonne per day underground mine at McCoy-Cove, producing an average of 102,000 gold oz. annually at all-in sustaining costs of US$948 per ounce. With mine construction capital costs pegged at US$81.9 million and assuming a US$1,400 per oz. gold price, the after-tax net present value estimate for the project comes in at US$178 million, at a 5% discount rate, with a 36% internal rate of return.

“The PEA underscores the importance of McCoy-Cove as one of the cornerstone assets in our soon-to-be spun-out i–80 Gold Corp, whose focus will remain the exploration and development of quality gold projects in Nevada, USA,” Ewan Downie, president and CEO of Premier Gold Mines, said in a news release. “Our go-forward plans for the project include an exploration ramp to allow an aggressive underground drill program to upgrade and expand mineral resources in advance of a future feasibility study and also provide a platform to increase recoverable gold resources and delineate the deposit still open down-plunge.”

The proposed mining scenario includes single-ramp access from surface with contractor mining using drift and fill mining methods. Processing would be under a toll-milling arrangement: there are three roasting facilities and two pressure oxidation facilities in northern Nevada that could potentially process the Cove mineralization.

The latest study assumes the mining of two of the four deposits at the site – Helen and Gap – both of these remain open.

McCoy-Cove is permitted under an environmental assessment (EA), which allows Premier to develop an exploration ramp, complete underground drilling and test mine up to 108,860 tonnes. The latest study assumes a new EA will be required to mine the Helen zone with an additional environmental impact statement (EIS) required for further dewatering. Baseline data collection, permitting and bonding for the EIS are expected to be completed in the second quarter of 2024.

In 2021 and 2022, Premier expects to focus on evaluating processing methods, optimizing the mine plan and completing baseline studies for the EIS, in addition to exploration decline development. A feasibility study work is expected in 2023 and 2024.

McCoy-Cove is just south of Nevada Gold Mines’ Phoenix mine and includes the Cove mine, which produced 2.6 million oz. of gold and 100 million oz. of silver between 1987 and 2001, as well as the McCoy mine, which generated over 600,000 gold ounces.

Indicated resources at the site stand at 1 million tonnes at 10.9 grams gold per tonne and 29.1 grams silver per tonne, for a total of 351,000 gold oz. and 943,000 oz. of silver. Additional inferred resources total 3.9 million tonnes grading 10.9 grams gold and 20.6 grams silver, for a further 1.4 million gold oz. and 2.6 million silver oz.

 

Print

Be the first to comment on "Premier updates PEA for ‘cornerstone asset’ McCoy-Cove"

Leave a comment

Your email address will not be published.


*


By continuing to browse you agree to our use of cookies. To learn more, click more information

Dear user, please be aware that we use cookies to help users navigate our website content and to help us understand how we can improve the user experience. If you have ideas for how we can improve our services, we’d love to hear from you. Click here to email us. By continuing to browse you agree to our use of cookies. Please see our Privacy & Cookie Usage Policy to learn more.

Close