Anvil boosts Mutoshi (January 24, 2005)

Due diligence work by Anvil Mining (AVM-T) indicates that the Kulumaziba coarse tailings deposit on the Mutoshi copper-cobalt project in the Kolwezi region of the Democratic Republic of Congo is higher in grade than previously thought.

Sampling of the tailings by the Perth, Australia-based company indicates an average copper grade in excess of 4%. In all, 450 fifty-kilogram samples were collected from a series of test pits dug to the original surface of the riverbed. The samples were reduced to 2-kg parcels and sent for assaying at A.H. Knight Laboratory in Kitwe, Zambia.

The tailings were originally discharged from the Mutoshi washing plant, previously operated by state-owned Gnrale des carrires et des mines (Gcamines) from 1960 to 1987. The material measures as much as 3 metres in thickness over an area up to 200 metres wide and 10 km long.

At last count, the Kulumaziba deposit was estimated to contain 5-7 million tonnes averaging 2-4% copper, based on historical records, including some 140 pit samples. The estimate does not conform to National Instrument 43-101 standards.

Anvil has already paid US$3 million and issued 153,950 shares at 62 apiece to Gecamines to acquire an 87.5% interest in private Congolese-based company Emiko, which owns 80% of the project. The shares are subject to a 4-month hold period that expires May 7. Anvil is also on the hook for US$8.75 million in staged payments, including US$4.25 million in 18 equal monthly payments beginning four months after commercial production begins. The company plans to fast-track Kulumaziba to production before year-end.

Anvil plans to reprocess the tailings via heavy media separation, which was successfully employed during the first stage of production at the company’s recently expanded Dikulushi copper-silver mine in the DRC’s Katanga Province (T.N.M., Oct. 15-21/04). Metallurgical recoveries are pegged at 70% to produce an oxide concentrate grading about 30% copper. Perth-based Intermet Engineering has been retained to design a million-tonne-per-year processing plant. In the end, annual copper-in-concentrate production is projected to exceed 25,000 tonnes.

“The Kulumaziba deposit provides an excellent opportunity for Anvil to initiate another low-capital-cost starter project, this time in the Kolwezi region,” says Michael O’Sullivan, Anvil’s general manager of development. “This project has the added advantage of low-cost mining and much better infrastructure than that found at Dikulushi, including access to the national hydroelectric power grid, which passes right through the property.”

The 137-sq.-km Mutoshi project also includes the Mutoshi mine, the Mutoshi Northwest and Nioka deposits, and the Kamukonko cobalt prospect. As well, the property encompasses some little-explored land along the southern edge of the Kolwezi Klippe geological feature, which has potential to host stratiform copper and cobalt mineralization. The Kolwezi Klippe historically accounted for about 70% of copper production in the DRC Copperbelt.

In addition to its 20% carried interest at Mutoshi, Gcamines retains a 2% net smelter return royalty (net of smelting, refining, transportation, assay and selling costs). The cost of Gcamines’ 20% interest will be carried by Anvil and recovered from cash flow.

In mid-December 2004, Anvil completed a private placement of 5.2 million special warrants priced at $5.25 apiece for gross proceeds of $27.5 million. A warrant is exchangeable for one share plus half a warrant, with a full warrant exercisable for an additional share at $6.25 per share. The warrants expire Dec. 16, 2007, but may be accelerated if Anvil’s shares price on the Toronto or Australian stock exchanges exceeds $8 for 20 consecutive days. All the securities are subject to a 4-month hold period that expires April 16, 2005.

Print

Be the first to comment on "Anvil boosts Mutoshi (January 24, 2005)"

Leave a comment

Your email address will not be published.


*


By continuing to browse you agree to our use of cookies. To learn more, click more information

Dear user, please be aware that we use cookies to help users navigate our website content and to help us understand how we can improve the user experience. If you have ideas for how we can improve our services, we’d love to hear from you. Click here to email us. By continuing to browse you agree to our use of cookies. Please see our Privacy & Cookie Usage Policy to learn more.

Close