El Condor expects to double reserves at Kemess project

With this year’s first-phase drilling program on the South Kemess property complete, 60% owner and operator El Condor Resources (VSE) is predicting a doubling of reserves.

St. Philips Resources (VSE) owns the other 40% of the property in north-central British Columbia.

Prior to beginning the drilling, preliminary estimates put reserves at about 78 million tons grading 0.30% copper and 0.018 oz. gold per ton. The deposit is described as blanket shaped, measuring about 3,000 ft. long (east-west), 200 ft. wide (north-south) and 295 ft. in thickness.

Drilling to the west and southwest returned the best results with holes 91-51 through 91-53 and holes 91-70 through 91-76 returning an average intersection of 359 ft. grading 0.019 oz. gold and 0.23% copper.

Holes 91-54 through 91-69 returned lower grade, narrower intersections. Hole 91-54, which did not return any significant results, was drilled on the northern boundary while holes 91-59 through 63 were drilled on the eastern boundary, and holes 91-55 through 91-69 were drilled on the southern boundary. The recent drilling also indicates the deposit is deeper to the southwest with holes 91-70 through 91-72 hitting mineralization at between 180 ft. and 370 ft. below surface.

Drilling on the property is continuing on 330-ft. stepouts to the west in a second-phase program budgeted at $1.7 million.

Hole Interval Width Gold Copper

(ft.) (ft.) (oz./ton) (%)

91-51 45.9-363.2 317.3 0.030 0.23

91-52 20.0-659.4 639.5 0.016 0.24

91-53 10.0-249.3 239.3 0.022 0.25

91-54 no significant assays

91-55 20.0-45.9 26.0 0.004 0.25

91-56 59.1-144.4 85.3 0.011 0.24

91-57 170.6-360.9 190.3 0.011 0.18

91-58 219.8-357.6 137.8 0.013 0.25

91-59 20.1-210.0 189.9 0.008 0.09

91-60 111.5-131.2 19.7 0.008 0.10

91-61 13.1-223.1 210.0 0.006 0.11

91-62 22.0-72.2 50.2 0.010 0.16

91-63 26.2-78.7 52.5 0.006 0.10

91-68 178.8-380.6 201.8 0.011 0.16

91-69 147.0-305.1 158.1 0.013 0.20

91-70 192.9-315.0 122.0 0.020 0.14

91-71 370.7-475.7 105.0 0.010 0.12

91-72 180.4-344.5 164.0 0.023 0.20

91-73 144.4-715.2 570.9 0.016 0.22

91-74 30.0-793.3 763.3 0.015 0.23

91-75 14.0-424.6 410.6 0.022 0.27

91-76 55.8-314.1 258.3 0.021 0.23

Print

 

Republish this article

Be the first to comment on "El Condor expects to double reserves at Kemess project"

Leave a comment

Your email address will not be published.


*


By continuing to browse you agree to our use of cookies. To learn more, click more information

Dear user, please be aware that we use cookies to help users navigate our website content and to help us understand how we can improve the user experience. If you have ideas for how we can improve our services, we’d love to hear from you. Click here to email us. By continuing to browse you agree to our use of cookies. Please see our Privacy & Cookie Usage Policy to learn more.

Close