Assays have been received by La Fosse Platinum Group (TSE) from two projects in northeastern Quebec. On the Marymac project, located 250 km north of Schefferville, three vertical holes tested the Redcliff deposit at the 1,000-ft horizon. The first hole intersected 17 ft assaying 1.37% copper, 0.3% nickel and 0.4 g platinum group metals per ton. The platinum-to-palladium ratio is 1:2.
On the Marymac No 1 deposit, an 11-ft section of disseminated sulphides assayed 0.77% copper and 0.51% nickel. This was followed by a 28-ft section of massive sulphides which graded 2.78% copper and 1.49% nickel across the first 22 ft.
Be the first to comment on "La Fosse drill results"