Several strong drill intersections have been completed by partners T & H Resources (40%), Jonpol Explorations (40%) and Coastoro Resources (20%) on their joint ventured property in Garrison Twp., Ont.
Hole 30 intersected 46 ft grading 0.95 oz gold per ton. The true width is approximately 20 ft. Hole 32 intersected two zones. The first is 35 ft wide an d assayed 0.12 oz gold per ton. Included in the section was 0.2 oz gold across 18 ft and a 7-ft section grading 0.25 oz. The second zone included 11.5 ft grading 0.31 oz.
Two zones were also cut by hole 37 which returned a 7-ft section grading 1.05 oz and a wide 120-ft section assaying 0.07 oz. Included within the latter section was 0.23 oz across 6 ft and 5.5 ft assaying 0.28 oz.
The three companies have arranged flow-through funding of $3 million which will finance exploration on the property in 1988.
Be the first to comment on "Jonpol cuts best hole yet on Garrcon bet"