Also, of the five samples mined, two came from areas previously considered barren by drilling. However after processing, economic gold values were assayed.
Based on the results, Central Crude feels that the underground program will result in expanded reserves. The metallurgical testing indicates gold recoveries of 95% using conventional milling methods.
Based on surface drilling, Hemlo, which holds a 60% stake in the property, estimates reserves of 1.77 million tons grading 0.24 oz gold per ton.
]]>
Be the first to comment on "Bulk sampling increases Eagle River reserves]]"