Results were mixed for the last holes of the 1989 drilling season on the Eskay Creek project owned jointly by Calpine Resources (VSE) and Stikine Resources (VSE). The project is about 50 miles north of Stewart, B.C. Drilling will continue to delineate the deposit on 25-metre centres through the winter.
Precious metal results were as follows while base metal assays are pending: IntervalLengthGoldSilver Hole No.(ft.)(ft.)(oz./ton)(oz./ton) 183518.2-665.8147.60.1610.89 including590.4-606.8 16.40.262 0.29 623.2-665.8 42.60.321 2.57 184672.4-701.9 29.50.118 0.42 185393.6-419.8 26.20.62450.01 186282.1-295.2 13.10.261 0.50 344.4-354.2 9.80.228 9.01 403.4-419.8 16.40.188 3.39 449.4-485.5 36.10.280 2.38 190387.0-403.4 16.40.132 0.62 191272.2-298.4 26.20.091 0.39 341.1-347.7 6.60.136 0.20 192344.4-351.0 6.60.48414.75 554.3-564.1 9.80.156 5.48 194426.4-439.5 13.10.179 1.62 198259.1-275.5 16.40.41120.77 199209.9-219.7 9.81.37057.12 200370.6-485.4114.80.18026.00 including370.6-390.3 19.70.53317.10 406.7-436.2 29.50.15459.55 203390.3-393.6 3.30.13611.70 204662.5-682.2 19.70.213 3.91 205761.0-763.9 2.90.575 0.23
Be the first to comment on "Eskay Creek results mixed"